The Efficiency Analysis of Low Impact Development Applied in Taiwan: A Case Study of Porous Pavement
Abstract:
LID Facilities includes porous pavement, rain garden, green roof, tree box filter facilities and so on, and in this study, porous pavement is taken as an example for discussion. In the part of laboratory experiments, the sand box experiments is designed to operate with the specified rainfall return period calculated by Horton formula and rainfall characteristics of Taipei. Then the outflow hydrograph in each designed rainfall of specified return period can be evaluated. As for model simulation, this study constructs LID simulation elements by SWMM model and tests the suitability for simulation of the outflow hydrograph obtained from experiments, and definitely quantifies the efficiency of water retention and flood reduction of porous pavement. The results fits well with the experimental observation data with less than 10% error of pick flow. It suggests that, with LID simulation elements constructed in this study, the efficiency of LID in actual on-site application can be evaluated.
The results shows that porous pavement is able to delay arrival time of pick about 5% ~10% and reduce the pick flow about 5%~20%, and hold the ability of near 3~5% water retention. It proves that application of LID can retain water and reduce flood in Taiwan.
