CALIFORNIA EARTHQUAKE CLEARINGHOUSE ACTIVATION FOR AUGUST 24, 2014, M6.0 SOUTH NAPA EARTHQUAKE

Anne Rosinski1, John G. Parrish2, Timothy P Mccrink2, Heidi Tremayne3, Maggie Ortiz4, Marjorie Greene5, Jay Berger4, J. Luke Luke Blair6, Mark Johnson7, Kevin Miller8, Jeri Seigel7, Kate Long9 and Fred Turner10, (1)California Geological Survey Menlo Park, Menlo Park, CA, United States, (2)California Geological Survey Sacramento, Sacramento, CA, United States, (3)Earthquake Engineering Research Institute, Oakland, United States, (4)Earthquake Engineering Research Institute, Oakland, CA, United States, (5)EERI, Oakland, CA, United States, (6)U.S. Geological Survey, Menlo Park, United States, (7)California Office of Emergency Services, Sacramento, CA, United States, (8)California Office of Emergency Services, Governor's Office, San Francisco, CA, United States, (9)Cal EMA, Pasadena, CA, United States, (10)California Seismic Safety Commission, Sacramento, CA, United States
Abstract:
The Clearinghouse’s principal functions are to 1) coordinate field investigations of earth scientists, engineers, and other participating researchers; 2) facilitate sharing of observations through regular meetings and through the Clearinghouse website; and 3) notify disaster responders of crucial observations or results. Shortly after 3:20 a.m., on August 24, 2014, Clearinghouse management committee organizations, the California Geological Survey (CGS), the Earthquake Engineering Research Institute (EERI), the United States Geological Survey (USGS), the California Office of Emergency Services (CalOES), and the California Seismic Safety Commission (CSSC), authorized activation of a virtual Clearinghouse and a physical Clearinghouse location. The California Geological Survey, which serves as the permanent, lead coordination organization for the Clearinghouse, provided all coordination with the state for all resources required for Clearinghouse activation. The Clearinghouse physical location, including mobile satellite communications truck, was opened at a Caltrans maintenance facility located at 3161 Jefferson Street, in Napa. This location remained active through August 26, 2014, during which time it drew the participation of over 100 experts from more than 40 different organizations, and over 1730 remote visitors via the Virtual Clearinghouse and online data compilation map. The Clearinghouse conducted three briefing calls each day with the State Operations Center (SOC) and Clearinghouse partners, and also conducted nightly briefings, accessible to remote participants via webex, with field personnel. Data collected by field researchers was compiled into a map through the efforts of EERI and USGS volunteers in the Napa Clearinghouse. EERI personnel continued to provide updates to the compilation map over an extended period of time following de-activation of the Clearinghouse. In addition, EERI managed the Clearinghouse website. Two overflights were conducted, for reconnaissance on August 24, with a scientist and an engineer, and on August 25, to collect high resolution still-frame imagery. Following de-activation of the Clearinghouse, a multi-agency, state-federal, cost-sharing agreement was reached to acquire airborne LiDAR of the region affected by surface fault rupture.