S22B-02
Lessons Learned from Eight Years’ Experience of Actual Operation, and Future Prospects of JMA Earthquake Early Warning System

Tuesday, 15 December 2015: 10:35
308 (Moscone South)
Mitsuyuki Hoshiba, MRI/JMA, Tsukuba, Japan and Yuji Nishimae, Japan Meteorological Agency, Tokyo, Japan
Abstract:
Since 2007, experiences of actual operation of EEW have been gained by the Japan Meteorological Agency (JMA). During this period, we have learned lessons from many M6- and M7-class earthquakes, and the Mw9.0 Tohoku earthquake.

During the Mw9.0 Tohoku earthquake, JMA system functioned well: it issued a warning message more than 15 s before strong ground shaking in the Tohoku district (relatively near distance from the epicenter). However, it was not perfect: in addition to the problem of large extent of fault rupture, some false warning messages were issued due to the confusion of the system because of simultaneous multiple aftershocks which occurred at the wide rupture area.

To address the problems, JMA will introduce two new methods into the operational system this year to start their tests, aiming at practical operation within a couple of years. One is Integrated Particle Filter (IPF) method, which is an integrated algorithm of multiple hypocenter determination techniques with Bayesian estimation, in which amplitude information is also used for hypocenter determination. The other is Propagation of Local Undamped Motion (PLUM) method, in which warning message is issued when strong ground shaking is detected at nearby stations around the target site (e.g., within 30 km). Here, hypocenter and magnitude are not required in PLUM.

Aiming at application for several years later, we are investigating a new approach, in which current wavefield is estimated in real time, and then future wavefield is predicted time evolutionally from the current situation using physics of wave propagation. Here, hypocenter and magnitude are not necessarily required, but real-time observation of ground shaking is necessary.

JMA also plans to predict long period ground motion (up to 8 s) with the EEW system for earthquake damage mitigation in high-rise buildings. Its test will start using the operational system in the near future.