Hydrocarbon Induced Seismicity in Northern Netherlands

Monday, 14 December 2015
Poster Hall (Moscone South)
Bernard Dost, Royal Netherlands Meteorological Institute, De Bilt, 3730, Netherlands
Abstract:
The northern Netherlands has been regarded aseismic until the first earthquakes started in 1986, after more than 25 years of gas production from the one of the largest on-shore gas-fields in the World, the Groningen field, and accompanying smaller gas fields. Due to the shallow sources, at approximately 3 km depth, even small magnitude events cause considerable damage to buildings in the region. Since the largest recorded event in the Groningen field in 2012 with ML= 3,6, more than 30.000 damage claims were received by the mining company. Since 1995 a seismic monitoring network is operational in the region, consisting of 8 200m deep boreholes with 4 levels of 3C 4,5 Hz geophones. The network was designed for a location threshold of ML=1,5 over a 40x 80 km region. Average station separation was 20 km. At the end of 2014, 245 events have been recorded with ML ≥ 1,5, out of a total of 1100.

Since 2003 a new mining law is in place in the Netherlands, which requires for each gas field in production a seismic risk analysis. Initially, due to the small number of events for specific fields, a general hazard (PSHA) was calculated for all gas-fields and a maximum magnitude was estimated at ML = 3,9. Since 2003 an increase in the activity rate is observed for the Groningen field, leading to the development of new models and a re-assessment of parameters like the maximum magnitude. More recently these models are extended to seismic risk, where also the fragility of the regional buildings is taken into account. Understanding the earthquake process is essential in taking mitigation measures. Continued research is focused on reducing the uncertainties in the hazard and risk models and is accompanied by an upgrade of the monitoring network.

In 2014 a new dense network was designed to monitor the Groningen gas field in this region (30*40 km) with an average separation of 4 km. This allows an improved location threshold (M>0,5) and location accuracy (50-100m). A detailed P- and S- velocity model is available for the region. In total 70 new 200m deep boreholes will be operational in 2015. At each borehole an accelerometer will be placed at the surface. In addition two deep downhole tools (3 km depth) are operational since 2013 and 4 broad-band sensors (STS-5) at 100m depth will be installed, covering the gas field.