Why does Japan use the probability method to set design flood?

Friday, 18 December 2015
Poster Hall (Moscone South)
Shinichiro Nakamura, Nagoya University, Graduate School of Engineering, Nagoya, Japan and Taikan Oki, University of Tokyo, Bunkyo-ku, Japan
Abstract:
Design flood is hypothetical flood to make flood prevention plan. In Japan, a probability method based on precipitation data is used to define the scale of design flood: Tone River, the biggest river in Japan, is 1 in 200 years, Shinano River is 1 in 150 years, and so on. It is one of important socio-hydrological issue how to set reasonable and acceptable design flood in a changing world.

The method to set design flood vary among countries. Although the probability method is also used in Netherland, but the base data is water level or discharge data and the probability is 1 in 1250 years (in fresh water section). On the other side, USA and China apply the maximum flood method which set the design flood based on the historical or probable maximum flood. This cases can leads a question: “what is the reason why the method vary among countries?” or “why does Japan use the probability method?” The purpose of this study is to clarify the historical process which the probability method was developed in Japan based on the literature.

In the late 19the century, the concept of “discharge” and modern river engineering were imported by Dutch engineers, and modern flood prevention plans were developed in Japan. In these plans, the design floods were set based on the historical maximum method. Although the historical maximum method had been used until World War 2, however, the method was changed to the probability method after the war because of limitations of historical maximum method under the specific socio-economic situations: (1) the budget limitation due to the war and the GHQ occupation, (2) the historical floods: Makurazaki typhoon in 1945, Kathleen typhoon in 1947, Ione typhoon in 1948, and so on, attacked Japan and broke the record of historical maximum discharge in main rivers and the flood disasters made the flood prevention projects difficult to complete. Then, Japanese hydrologists imported the hydrological probability statistics from the West to take account of socio-economic situation in design flood, and they applied to Japanese rivers in 1958. The probability method was applied Japan to adapt the specific socio-economic and natural situation during the confusion after the war.