NH33B-1919
URBAN FLOOD RISK ASSESSMENT UNDER UNCERTAIN CONDITIONS AND SCARCE INFORMATION

Wednesday, 16 December 2015
Poster Hall (Moscone South)
Edna Margarita Rodríguez-Gaviria1,2, Verónica Catalina Botero-Fernández1 and Grupo de Investigaci, (1)Universidad Nacional de Colombia, Medellin, Medellin, Colombia, (2)Colegio Mayor de Antioquia, Antioquia, Medellín, Colombia
Abstract:
Flood risk management in small urban areas in Colombia has a great degree of uncertainty due to the low availability and quality of data, the non-existent personnel qualified in the collection and processing of data, and the insufficient information to evaluate the risk and vulnerability. It is because of this that two methods are developed: one for the generation of flood threat maps for different return periods combining historical, geomorphological, and hydrological hydraulic methods assisted by remote sensors and SIG through the use of data acquired through field campaigns, official hydrological networks, orthophotos, multitemporal topographic maps, and ASTER, STRM, and LiDAR images. And another method in which categorical variables are established, linking local physical, social, economical, environmental and political-institutional factors that are explored through different media such as reports, news, databases, transects, interviews, community workshops, and surveys conducted at homes. Such variables were included within an analysis of multiple correspondence to conduct a descriptive study of the exposure, susceptibility, and capacity conditions and to create a vulnerability index that was spatially plotted spatially on maps. The uncertainty is reduced in the measure in which local knowledge is used as a source of information acquisition, of validation of what already exists, and of calibration of the proposed methods. This research was applied to the urban centers of Caucasia (Antioquia) and Plato (Magdalena), which have been historically affected by slow flooding of the Magdalena and Cauca river, it being especially useful in the selection of best alternatives for risk management, planning for development, and land use management, with the possibility of replicating it to benefit other municipalities that experience the same reality.